PROJECT MANAGER & DESIGN - INFRASTRUCTURES

  • NEW INTERNATIONAL AIRPORT IN ANGOLA

    In terms of electrical installations, was provided a distribution network internal medium voltage consists of 6 transformer stations with a total installed capacity of 13MVA, there is still a priority network NO BREAK with an installed capacity of 1MVA. With regard to telecommunications building will be equipped with 2 DATA CENTER equipped with building blocks capable of storage, backup, virtualization and connectivity.

  • MERCADO ABASTECEDOR REGIÃO LISBOA

    In partnership with the Portuguese Group of Frio and Soares da Costa, Acribia worked in the preliminary design of HVAC and refrigeration installations. In partnership, latest, with Pedro Sousa - Projectos e Gestão de Instalações Técnicas, Ltd. Acribia, also worked in conception of the facilities HVAC, refrigeration, water, sewer, fire network and centralized technical management and monitoring of respective work.

    Location: S. Julião do Tojal - Portugal

  • TÚNEL DA ROTUNDA CENTRO SUL

    Road Tunnel, with high level of complexity conception of drainage system. The tunnel, as also equipped with advanced security systems of detection and extinguishing fires.

    Location: Almada - Portugal

  • EDIFÍCIO DE CONTROLO AÉREO DA ASA

    Construction of ASA Air Traffic Control Building.

    Estimated Cost: € 3.370.000

    Location: Républica de Cabo Verde

  • NREN

    Process of high technical complexity, which provides a turnkey solution for implementing an NREN with links to 10 Gbit/s. With an approximate length of 6.000 km the network is designed to serve a population of 2.55 million users. The conception of this project includes the development of all applicational component to allow communication between multiple locations, systems and services.

  • METRO MONDEGO

    In this section with a length of 16 km, were performed work on upgrading of electrical infrastructure and telecommunications as well as redefining the lighting of several access nodes of the route.

    Location: Lousã - Portugal

  • PARQUE AVENTURA - ALMADA

    Recreational park with an area of ​​28.300 m2, comprising a support building, amphitheater and several playgrounds. In this process there was a detailed study of the system of stormwater runoff, to prevent possible flooding of the land due to the high irregularity of the pavement.

    Location: Almada - Portugal

  • CAMINHOS DE FERRO PORTUGUESES

    Requalification of Railway Station Building (Rossio).

    Estimated Cost: € 7.000.000

    Location: Lisboa - Portugal

    Year: 2004

  • INST. CONST. CONSERVAÇÃO RODOVIÁRIA

    Freeway Road Enlargement – IC19 (alfragide/Queluz): Management and supervision of sontruction site works, including health and safety coordination.

    Estimated Cost: € 6.710.000

    Location: Lisboa - Portugal

    Year: 2000 - 2001

  • PASSAGEM SUPERIOR ANTUÃ

    Foundations and Structures Designs.

    Location: Estarreja - Portugal

    Year: 1994 - 1995

  • ESTAÇÃO DE ERMESINDE

    Foundations, Structures and Plumbing Designs.

    Estimated Cost: € 25.000.000

    Location: Ermesinde - Portugal

    Year: 1995 - 1997

  • NOVO ESTÁDIO DO BESSA PARA EURO 2004

    Foundations, Structures and Plumbing Designs.

    Estimated Cost: € 40.000.000

    Location: Boavista - Portugal

    Year: 1998 - 2004

  • ESPAÇO PÚBLICO DA ZONA DAS ANTAS

    Land Movement Design; Road and Hydraulic infrastructures designs; Geotechnical works design; Solid waste removal plan; Road Node design.

    Estimated Cost: € 21.000.000

    Location: Porto - Portugal

    Year: 2001 - 2004

  • PASSAGEM INFERIOR RODOVIÁRIA

    Landscape Engineering Design; Hydraulic infrastructures design; Foundations, structures and electrical designs; Safety and health plan.

    Estimated Cost: € 300.000

    Location: Braga - Portugal

    Year: 2001 - 2004

  • REMODELAÇÃO PARTE DO CAIS SUL

    Management and Quality Control.

    Estimated Cost: € 2.200.000

    Location: Leixões - Portugal

    Year: 2001 - 2003

  • ESPAÇO PÚBLICO

    Road and Hydraulic Infrastructures Designs; Road signs plan design.

    Estimated Cost: € 1.300.000

    Location: Viseu - Portugal

    Year: 2001 - 2004

  • ESTÁDIO MUNICIPAL DO CANDAL

    Foundations, Structures and Plumbing Designs.

    Estimated Cost: € 3.000.000

    Location: Vila Nova de Gaia - Portugal

    Year: 2001 - 2003

  • PARQUE DE SERRALVES

    Hydraulic Infrastructures Design.

    Estimated Cost: € 400.000

    Location: Vila Nova de Gaia - Portugal

    Year: 2002 - 2003

  • PONTE DE ANGEJA SOBRE O RIO VOUGA

    Management and Quality Control.

    Estimated Cost: € 1.500.000

    Location: Aveiro - Portugal

    Year: 2003

  • ACESSIBILIDADES AO BESSA

    Management and Quality Control; Safety and health coordination.

    Estimated Cost: € 1.500.000

    Location: Porto - Portugal

    Year: 2004

  • GAIAPOLIS 2ª FASE

    Engineering Design.

    Estimated Cost: € 5.300.000

    Location: Vila Nova de Gaia - Portugal

    Year: 2004 - 2006

  • DEMOLIÇÕES NA BAIXA DE COIMBRA

    Demolition Plan; Management and Quality control.

    Estimated Cost: € 1.000.000

    Location: Coimbra - Portugal

    Year: 2005

  • SUPRESSÃO DAS 5 PASSAGENS DE NÍVEL

    Landscape Engineering Design; Hydraulic infrastructures design; Foundations, structures and electrical designs; Safety and health plan.

    Estimated Cost: € 3.833.000

    Location: Viana do Castelo - Portugal

    Year: 2005 - 2009

  • PONTE PEDONAL SOBRE CANAIS

    Management and Quality Control; Safety and health coordination; Environmental management in construction.

    Estimated Cost: € 500.000

    Location: Aveiro - Portugal

    Year: 2005 - 2006

  • REMODELAÇÃO PLATAFORMA APDL

    Foundations, Structures and Plumbing Designs; Management and quality Control; Safety and health plan and coordination.

    Estimated Cost: € 600.000

    Location: Porto - Portugal

    Year: 2005 - 2008

  • PASSAGEM SUPERIOR DE ALFARELOS

    Safety and Health Coordination.

    Location: Alfarelos - Portugal

    Year: 2005 - 2006

  • URBANIZAÇÃO E INFRA-ESTRUTURAS

    Management and Quality Control; Safety and health coordination.

    Estimated Cost: € 2.000.000

    Location: Alto do Lumiar - Portugal

    Year: 2006 - 2007

  • PASSAGEM INFERIOR

    Landscape Engineering Design; Hydraulic infrastructures design; Foundations, structures and electrical designs; Safety and health plan.

    Estimated Cost: € 510.500

    Location: Matosinhos - Portugal

    Year: 2007 - In course

  • AEROPORTO DUBLIN, IRLANDA TERMINAL 2

    Facades Design.

    Construction Area: 40.000 m2

    Estimated Cost: € 45.000.000

    Location: Dublin - Irlanda

    Year: 2007 - 2009

  • LOTEAMENTO EM SERZEDO 17 LOTES

    Landscape Engineering Design; Road and hydraulic infrastructures designs; Road signs plan design.

    Location: Vila Nova de Gaia - Portugal

    Year: 2007

  • LOTEAMENTO DA SECA DO BACALHAU

    Infraestructures Designs.

    Location: Vila Nova de Gaia - Portugal

    Year: 2007 - In course

  • PONTE PEDONAL SOBRE O RIO AVE

    Engineering Design.

    Estimated Cost: € 600.000

    Location: Santo Tirso - Portugal

    Year: 2007 - In course

  • REPERFILAMENTO EN13

    Safety and Health Coordination.

    Estimated Cost: € 1.500.000

    Location: Maia - Portugal

    Year: 2008

  • ÁGUAS DO AVE

    Management and Quality Control; Safety and health coordination; Environmental management in construction.

    Estimated Cost: € 11.500.000

  • ÁGUAS DO DOURO E PAIVA

    Management and Quality Control; Safety and health coordination; Environmental management in construction.

    Estimated Cost: € 11.200.000

  • RUA DAS CONDOMINHAS

    Management and Quality Control; Safety and health coordination; Archaeological monitoring.

    Construction Area: 799 m2

    Estimated Cost: € 700.000

    Location: Porto - Portugal

    Year: 2009 - 2010

  • DEMOLIÇÃO EDIFÍCIOS DEVOLUTOS

    Demolition Plan; Management and Quality control; Safety and health coordination.

    Estimated Cost: € 50.000

    Location: Lisboa - Portugal

    Year: 2010

  • REQUALIFICAÇÃO ESPAÇO PÚBLICO

    Architetcural and Engineering Designs Checking.

    Estimated Cost: € 2.054.403

    Location: Lisboa - Portugal

    Year: 2010 - 2011

  • TERMINAL AEROPORTO DE LISBOA

    Expansion of Lisbon Airport Transfer Terminal.

    Estimated Cost: € 1.637.000

    Location: Lisboa - Portugal

  • PONTE 25 DE ABRIL

    Placement of Metal Safety Rails and Side protection networks on the northern overpass of the 25 de abril bridge.

    Estimated Cost: € 1.294.000

    Location: Lisboa - Portugal

  • FISCALIZAÇÃO DA ESTRADA KUITO-ANDULO

    Rehabilitation of the Kuito-Andulo road.

    Estimated Cost: 88.000.000 USD

    Location: Kuito-Andulo - República de Angola

  • ABASTECIMENTO ÁGUA CIDADE DO SOYO

    Water Supply project for the city of Soyo

    Estimated Cost: 7.350.000 USD

    Location: Soyo - República de Angola

  • ABASTECIMENTO DE ÁGUA A CABINDA

    Water Supply project for the city of Cabinda

    Estimated Cost: 5.500.000 USD

    Location: Cabinda - República de Angola

  • ABASTECIMENTO DE ÁGUA

    Water supply project for the city of Lândana

    Estimated Cost: 6.715.000 USD

    Location: Lândana - República de Angola

  • AEROPORTOS E NAVEGAÇÃO AÉREA

    Airport Expansion (Faro)

    Estimated Cost: € 15.000.000

    Location: Faro - Portugal

    Year: 1988 - 1989